Operation & Management


02 Planning of Intermodal Transfer Facilities

  1. Feasibility Study of Adding New Ramps on Provincial Highway 74 between 26k ~ 30k and Adding New Ramps for Connecting Provincial Highways No. 74 and 19A..   
  2. Feasibility Study for a New Interchange at Taishan on Freeway No. 1.    
  3. Planning for the Intermodal Transfer Facilities in Zhanghua County and Jiayi City. 2004.10  
  4. Need for the Provision of Transfer Facilities at Taoyuan MRT Station Areas. 2009.06  
  5. Planning & Basic Design for the Intermodal Transfer Facilities in Kaohsiung Life Circle, & Wufeng, Dajia & Shalu in Taichung Metropolitan Area 2010.11  
  6. Feasibility Study for a New Ramp Connecting Freeway No. 1 and Dingli Road at Dingjing System Interchange, and New Frontage Roads from Jiuru to Nanzi Roads beside Freeway No. 1.  2011.09  
  7. Feasibility Study and Planning of New Ramps for Connecting Freeway No. 5 and County Road No. 4 in Yilan County.  2012.11  
  8. Feasibility Study and Preliminary Design of New Ramp Connection to Freeway 1 on Zhongzhang Expressway(Provincial Highway 74) 2013.03  
  9. Feasibility Study and Planning for Adding Dali No.3 Interchange to Provincial Highway 74.  2013.11