Civil Engineering


02 Engineering Planning for Interchange Improvement

  1. Feasibility Study of Adding New Ramps on Provincial Highway 74 between 26k ~ 30k and Adding New Ramps for Connecting Provincial Highways No. 74 and 19A..   
  2. Feasibility Study for a New Interchange at Taishan on Freeway No. 1.    
  3. Feasibility Study for a New Ramp Connecting Freeway No. 1 and Dingli Road at Dingjing System Interchange, and New Frontage Roads from Jiuru to Nanzi Roads beside Freeway No. 1.  2011.09  
  4. Feasibility Study and Planning of New Ramps for Connecting Freeway No. 5 and County Road No. 4 in Yilan County.  2012.11  
  5. Feasibility Study and Preliminary Design of New Ramp Connection to Freeway 1 on Zhongzhang Expressway(Provincial Highway 74) 2013.03  
  6. Feasibility Study and Planning for Adding Dali No.3 Interchange to Provincial Highway 74.  2013.11