Operation & Management
Key Projects Introduction
01 Development of Intermodal Transfer Facilities
02 Planning of Intermodal Transfer Facilities
03 Operation of Transportation Services
04 Transport Operations & Management Policy
05 Green Transport Operations Planning
06 Bus Route Right-of-Way Applicatio
- General Consultancy Service for Human-based Street Design in Taoyuan. 2017.05
- Feasibility Study for Improving Railway Alignment between Guishan and Waiao of Yilan Line. 2016.12
- Feasibility Study of Xizhi Access Road. 2011.08
- Assessment and Planning of Traffic Improvement Alternatives for Shuangxi Area Access Road in Taipei City. 2013.04
- Four-year(2015-2018) Life Circle Roadway Improvement Projects in Yilan County. 2014.02
- Feasibility Study of Adding New Ramps on Provincial Highway 74 between 26k ~ 30k and Adding New Ramps for Connecting Provincial Highways No. 74 and 19A..
- Feasibility Study for a New Ramp Connecting Freeway No. 1 and Dingli Road at Dingjing System Interchange, and New Frontage Roads from Jiuru to Nanzi Roads beside Freeway No. 1. 2011.09
- Feasibility Study and Planning of New Ramps for Connecting Freeway No. 5 and County Road No. 4 in Yilan County. 2012.11
- Feasibility Study and Preliminary Design of New Ramp Connection to Freeway 1 on Zhongzhang Expressway(Provincial Highway 74) 2013.03
- Feasibility Study for a New Interchange at Taishan on Freeway No. 1.
- Design and Construction Supervision of Freeway 5 Access Road at Erjie from Freeway 5 to County Road No. 31.
- Planning, Design and Permit Application of Temporary Parking Lots on Site Ji-1 on Wenhua Rd., Section 3 in Linkou District, New Taipei City 2016.03
- Construction of Bus Parking Bay by Taipei 101 Building on Xinyi Road. 2010.12
- Design and Construction Supervision of for the New Sicheng No. 3 Road and Improvements on County Road No.13 in Yilan County. 2103.08
- Design and Construction Supervision of Access Road No. 2 of Meihua Scenic District 2012.09
- Impacts of Revenue Service of High Speed Rail System on Other Intercity Public Transportation Modes and Their Strategies in Response. 2007.11
- A Study on the Characteristics & Management Mechanism of Tour Bus Transportation Industry
- A Study on the Certification Process of Bus Safety & Quality. 2012.08
- An Improvement Plan for Upgrading Intermodal Passenger Services of Eastern Railway in Taiwan. 2009.01
- Strategic Planning and Demonstration of Green Transport System in Taipei County 2008.02
- Preliminary Planning of Public Bike Systems in Pingtong County, Hualien County and Luodong Area.
- Strategic Planning and Demonstration of Green Transport System in Taipei County
- Deployment and Operational Planning of Public Bicycle Systems in New Taipei City, Taichung City, Pingtong City & Taoyuan City, etc.
- Operation Plan of Hybrid Low-Floored Buses for Servicing 2010 Taipei International Flora Exposition.
- Operation Plan of Low-Floored Buses for Xinyi Main Line
- Operation Plan of Hybrid Low-Floored Buses for Servicing 2010 Taipei International Flora Exposition.
- Application of Bus Route Right-of-Way from Taipei to Yilan via Freeway No.5